Next 8 hours
Your actions, on every screen in the plant.
The actions your team agrees on at the huddle stay in view all shift: on the huddle board, at a desk and on the display over the line.
Line Remote Display · Line 4 · Harbor Point Plant
Line 4 at 09:40, Shift A: OEE 71.4%, off target against 78.0%; rate 182 a minute; 24 minutes down in 6 stops; 96 minutes to the changeover. Open actions: #4120, M. Chen, 9 days late; #4196, L. Ortega, due Oct 13. Safety: Shift A, Green 85. Each panel ships today, the safety color and the open actions included; cycling them on one screen is the concept. Played, the shift runs in about two minutes, one figure at a time.
Manage the handover from one crew to the next.
Before Shift A clocks in, the handover card shows what the last shift left: the line's four results against goal and every open action, overdue first. The crew takes it into the huddle, so the next shift starts where the last one stopped.
Shift Handover · Line 4
Shift A 06:00–14:00
At 05:15
Illustrative- Quality Right 1st Time 97.2% Off target Goal ≥ 98%
- Delivery OEE 71.4% Off target Goal ≥ 78.0%
- Cost CIL completed 88% Off target Goal ≥ 95%
- Involvement SEE reports per shift no data No data
17 open · 1 overdue · 3 due soon Line Action Plan · overdue and due soon first
- #4120 Replace worn starwheel on Labeler Maya Chen Line lead Oct 3 · 9 days late
- #4158 Re-mark the walkway by the Palletizer Dana Ruiz EHS lead Due today · Oct 12
- #4166 Add a cap-chute clean to the Capper CIL Maya Chen Line lead Due soon · Oct 14
Showing 3 of 17 open on Line 4
Line lead · Line Action Plan
Huddle before the shift starts, then run the shift on the plan.
The Line Action Plan switches to the upcoming shift 60 minutes before it starts, by default, so the team answers the site's readiness questions at the huddle: safety, quality, parts at hand, whatever the line needs. The color it lands on is what the Line Remote Display shows all shift; it never grants or blocks a start, the huddle acts on it. Then the same board carries the shift's actions until the next team takes over.
Read the rule behind the color05:00 Sixty minutes before Shift A starts, the Line Action Plan switches to Shift A and the readiness questions open over the board. The color stays grey until the team answers.
05:25–05:45 At the huddle the team answers the five questions one at a time, and the score and its trigger color move with each answer. #4120 is 9 days overdue, so Q5 is a No: 85, Green for Shift A, on the Line Remote Display all shift.
06:00–13:00 Shift A runs on the same board: an irritant becomes an action, owners are assigned, statuses move, finished work goes up on Successes, and the detail drawer holds the comments.
13:00–14:00 The board moves to Shift B, 60 minutes early. J. Patel's team updates #4120, answers its own questions on a different path to Green 85 and adds a note, while the display shows Shift A beside Shift B.
13:00–14:00 The board moves to Shift B, 60 minutes early. J. Patel's team updates #4120 and answers its own questions on a different path to Green 85, while the display shows Shift A beside Shift B.
Mon Oct 12 · Drag the playhead to change the time
Timeline from 04:00 to 15:00. The shift running: Shift C until 06:00, Shift A 06:00 to 14:00, then Shift B. The board shows: Shift C until 05:00, Shift A from 05:00, Shift B from 13:00, each 60 minutes early. The Line Action Plan below follows the playhead from 05:00 to 14:00.
Line Action Plan
Shift A · 6:00 am – 2:00 pmShift B · 2:00 pm – 10:00 pmLine Remote DisplayShift ANot answeredShift AGreen 85Shift BNot answeredShift BGreen 85
- S
- Q
- D
- C
- I
| Order | Star | Type | Area | Status | Problem Statement | Action Description | Owner | Due Date |
|---|---|---|---|---|---|---|---|---|
| Quality | Labeler | Not startedIn progress | Labels skew at full speed | Replace worn starwheel on Labeler#4120 · Labeler · Labels skew at full speed2 comments3 comments4 comments | M. Chen | Oct 3 · 9d late | ||
| Delivery | Capper | Not startedIn progress | Caps bridge in the chute late in a run | Add a cap-chute clean to the Capper CIL#4166 · Capper · Caps bridge in the chute late in a run1 comments | M. Chen | Oct 14 | ||
| Safety | Palletizer | ReadyDone | Walkway marking worn by the Palletizer | Re-mark the walkway by the Palletizer#4158 · Palletizer · Walkway marking worn by the Palletizer1 comments | D. Ruiz | Oct 12 | ||
| Delivery | Labeler | Not started | Wrong starwheel size fitted at a changeover · RCA #219 | Add starwheel size check to changeover checklist#4190 · Labeler · Wrong starwheel size fitted at a changeover · RCA #2192 comments | L. Ortega | Oct 15 | ||
| Cost | Case Packer | Not startedIn progressDone | Glue strings at start-up | Clean and re-set the Case Packer glue nozzle#4196 · Case Packer · Glue strings at start-up1 comments | UnassignedL. Ortega | Oct 13 | ||
| Delivery | Line 4 | Ready | OEE 71.4% against the 78.0% goal OEE · Week 41 | Close the OEE gap at Line 4#4182 · Line 4 · OEE 71.4% against the 78.0% goal | L. Ortega | Oct 19 |
Information & Visitors
- WP-0457 hot work on the mezzanine · daily check by 10:00
- 11:16 flavor change: Lemon Zest to Sparkling Lime · target 35 min
- Shift B · J. Patel: the Labeler cover is buddied until 16:00
New Problems & Irritants
- Glare on the Filler HMI in the morning sun
- Case Packer glue strings at start-upCase Packer glue strings at start-up Added as #4196Palletizer light curtain trips on wrap tails
Successes
- Zero safety incidents on Line 4 in September
- Palletizer walkway re-marked · #4158
- Case Packer glue fixed the same shift · #4196
- Changeover to Sparkling Lime in 35 min, on target
Shift readiness (Decision Tree: 10/12/2026 - Shift A)(Decision Tree: 10/12/2026 - Shift B)
Shift readinessLine 4 · Decision Tree
—2550708585—2550707085Not answeredRedRedYellowGreenGreenNot answeredRedRedYellowYellowGreen
Shift A · Oct 12Shift B · Oct 12Lower 60 · Upper 85
- Q1
Are all machine guards in place and interlocks tested?Safety25 · Force Red on No
Answer: Not answeredYesNot answeredYes - Q2
Has Quality released the line for the first order of the shift?Quality25 · Force Red on No · End on False
Answer: Not answeredYesNot answeredYes - Q3
Are the parts and materials for this run staged at the line?Parts20
Answer: Not answeredYesNot answeredYes - Q4
Is every station staffed by someone trained on it?People15
Answer: Not answeredYesNot answeredNo - Q5
Are the actions due this shift owned and on track?Actions15
Answer: Not answeredNoNot answeredYes
Grey until the team answers. Each Yes adds its weight.Green for Shift A · 1 overdue action on the planGrey until the team answers. Each Yes adds its weight.Green for Shift B · #4120 in progress, its last step owned on Shift B
Replace worn starwheel on Labeler
Labels skew at full speed
Not startedIn progressQualityDailyDue Oct 3M. Chen
Worn starwheel confirmed on the Labeler. Replacement ordered from the supplier.
The supplier is late. New ETA: Monday, Oct 12, first thing.
The new starwheel is at the line. L. Ortega fits it in the 11:16 changeover; the alignment check runs on Shift B.
Shift B has the alignment check at 14:30. I close this when it passes.
Write a comment…The new starwheel is at the line. L. Ortega fits it in the 11:16 changeover; the alignment check runs on Shift B.Write a comment…Shift B has the alignment check at 14:30. I close this when it passes.Write a comment…
Take action
SMART Actions
Plant Toolbox has a place for every letter. Here is an action raised from an off-target OEE result, one letter at a time.
What makes an action SMART
Hover over or tap a letter to see its fields on the action.Scroll to play it, or tap a letter to jump to it.
Keyboard: use the arrow keys to step through.
#4182
Close the OEE gap at Line 4
Line Action Plan · Harbor Point › Packaging › Line 4
Linked KPI
OEE · Week 41: Oct 4 – Oct 10, 2026 · −6.6 ppProblem statement
Line 4 ran at 71.4% OEE in Week 41, under the 78.0% goal. Filler infeed jams look like the biggest loss.
- Owner
- Luis Ortega
- Due
- Oct 19, 2026
Action Planning
Actions from everywhere, in one plan.
Add an action right where you're working, from a KPI result, an investigation, an incident or a safety visit, without switching to Action Planning. Or add it on the plan itself when that's easier. Either way, it lands on the board where the work belongs.
-
Score Card
KPI results
Each board shows its KPIs against goal. An off-target result gets an action on that board, and the result's KPI, period, value, goal and gap can come with it.
Lands on the area's own board
-
Root Cause Analysis
Root cause analyses
Corrective actions come out of the investigation with a chip back to the RCA, due three days out by default.
Lands on the RCA's line board
-
Incidents
Safety incidents
Follow-up actions are raised from the incident record, with the incident linked.
Lands on the board for the incident's location
-
Management Safety Visit
Management Safety Visits
Follow-ups from a leader's safety visit become actions with an owner, not notes in a binder.
Lands on the board for the visit's location
-
Projects
Project tasks
Each task on a project is an action too, with the project's section and team and its own owner.
Lands on the project's board
-
Defects
Defects and RCA pages
Take Action on a defect or an RCA page opens a draft that shares the page's comment thread. Nothing is saved until the first edit.
Lands on the defect's line board
See it in action.
A 60-minute demo in the Plant Toolbox sandbox follows one line from the 05:15 handover through the 05:45 huddle to the end of Shift A.